CareerPlanSign in

Construction Scheduler - Memphis

Memphis, TN💼 Full-time🗓 2026-09-18 → 2026-09-29

Core

Develop, maintain, and communicate construction schedules for field teams, subcontractors, and leadership to drive project end dates and manage recovery plans.

Role type

Senior Construction Scheduler (IC)

Builds

CPM baselines, live schedule updates, look-aheads, and time-impact analyses for construction projects

Domain

Construction project controls

Required skills

CPM scheduling, Oracle Primavera P6, critical path analysis, resource loading, time-impact analysis, DCMA 14-point metrics, site visits, variance reporting

Preferred skills

PSP, PMI-SP, PMP, CCM, BIM 4D (Navisworks/Synchro), Power BI, Smartsheet, Procore, Autodesk Construction Cloud, cost loading, earned value

Technologies

Oracle Primavera P6, Navisworks, Synchro, Power BI, Smartsheet, Procore, Autodesk Construction Cloud

Responsibilities

Build baseline CPM schedules from drawings and specs; maintain live schedules and update logic; identify critical path and float erosion; produce look-aheads and recovery scenarios; coordinate with PMs and superintendents; prepare variance reports and executive summaries; support claims and delay documentation; enforce schedule standards; facilitate pull-planning sessions; visit the site regularly.

Seniority

Mid-Senior, hands-on IC

Sourced via greenhouse · Listed on CareerPlan, which tracks 855,000+ jobs from 20+ sources.