CareerPlanSign in

Telecom Electrical Engineer – Data Center Construction Projects

Santiago, Latin America, cl💼 Full-time🗓 2026-05-25 → 2026-09-28

Core

Design, review, and coordinate low-voltage telecom and network systems including structured cabling for data center construction projects.

Role type

Telecom Electrical Engineer (Data Center Construction)

Builds

Structured cabling and communications infrastructure for data centers

Domain

Data Center Construction / Low-Voltage Electrical Systems

Deliverable

product features

Required skills

Design and review of telecom/network systems, coordination of structured cabling installation, integration with electrical infrastructure, commissioning and testing

Preferred skills

Knowledge of data center environments

Technologies

Structured cabling, networking systems, low-voltage systems

Responsibilities

Design and review telecom and network systems, Coordinate installation of structured cabling and systems, Ensure integration with overall electrical infrastructure, Support commissioning and testing

Sourced via smartrecruiters · Listed on CareerPlan, which tracks 854,000+ jobs from 20+ sources.